|
Also at the 3rd meeting, a plan was drawn up for a 16' banner/feather flag. Paul took the plans for the flag to cut and assemble. Tony Reiser and Gail helped at Burlesque Kites with the assembly. |
After the kites were sewn by Tony Reiser, Tony and Steve Ferrel added the finishing touches, pockets, rods, bridling, etc. On September 10, 1992, the 4' rokkaku could be seen in the skies above Luther Crest (battling it out with a hawk) and by the 14th (LVKS meeting) the 6' was complete all but bridling. The flag was mostly done and completed on the 15th.
|
This was the first club Rokkaku made in Feb. 1992. The 7.5' tall Rok was made by Andy Gelinas. The center logo was made by Gail Erich. |